The 400 megawatts Bui Dam cost Ghana 630 million Dollars ($ 1, 575,000 per megawatt).

But President Akufo-Addo cuts sod for the construction of a 60 megawatts Pwalugu Dam at a cost of 997 million dollars ($ 16,616,666. 667 per megawatt).

The difference between the PER MEGAWATT COST of the Bui Dam and that of Pwalugu which President Akufo-Addo wants to construct culminates into $15,041,666.667 (MORE THAN 15 MILLION DOLLARS).

If a President who came to power on the wings of protecting the public purse can maim, destroy, steal and kill the public purse he swore to protect like this, then we are better off being under the governance of the DEVIL himself.

#OperationRescueGh